road-construction
There will be a lot of work going on this week and the Contractor is working toward paving the next portion of roadway late next week. But this week, the plans include the following:
1. Preparing for sidewalks and driveways on James,
2. Pouring sidewalks and driveways on Stuart working north from Rose St. and then potentially down James,
3. Pouring curb and gutter on Henry and Mesquite,
4. Excavating the roadway on Lilly and Stuart, east of Rose St., and
5 Removing driveways on Stuart, east of Rose.
We appreciate everyone’s patience and cooperation. If you have any questions, please let us know.